For utility-scale battery owners
More usable energy.
From the site you own.
Batteries age. Your site’s potential doesn’t have to decline with them.
We’re developing controls and integration that let owners add modern batteries as needed and plan for capacity guarantees.
Explore the approach ↓
/ The technical solution(01)
Add capacity.
Plan to keep it.
Our controls and integration enable modern battery deployments as needed, renewing site capacity as the original batteries age.
01 / Core product
Controls & integration
Enable new energy storage systems to operate as part of an evolving site.
02 / What it enables
Deploy batteries as needed
Integrate additional modern batteries as needed.
03 / Capacity assurance
Capacity-guarantee warranties
Recurring integration and deployment underpin capacity-guarantee warranties, with terms defined for each project.
/ Why existing sites(02)
New sites face years of procurement delays.
Augmenting deploys faster
- MV/HV transformer lead time
- 32mo avg.
- Interconnection lead time
- 61mo avg.
/ The operating challenge(03)
Site availability is suffering.Interconnections are underutilized.
- State-of-charge imbalance
- Uneven charge levels create curtailed system limits.
- Service outages
- Sites experience longer or more frequent outages for module or HVAC maintenance.
- Battery degradation
- Utility Energy sites degrade ~2% annually.
U.S. grid / Modeled degraded capacity
- $3bnDegraded capacity / 2027
- $13bnDegraded capacity / 2037
- ~16%Annual growth / 2027–2037
/ Our team(04)
Best-in-industry experts with deep Tesla Megapack experience.
- ✓Project
- ✓Commissioning
- ✓Service
/ Design with us(05)
Your site.
An augmentation plan.
We’re looking for site owners to partner with us on an augmentation design and economic analysis for each site.
What we’ll work through
- Capacity needs and augmentation assessments
- Site architecture and electrical engineering
- Controls architecture and integration design
- EMS, plant controller, and SCADA interfaces
- Protection, commissioning, and deployment planning
- Augmentation economics for the site
Discuss your site